Local Traffic Committee Meeting Minutes 6 July 2020 |
Minutes of Local Traffic Committee Meeting
Held electronically in July 2020
ACKNOWLEDGEMENT OF COUNTRY BY CHAIRPERSON
I acknowledge the Gadigal and Wangal people of the Eora nation on whose country we are meeting today, and their elders past and present.
COMMITTEE REPRESENTATIVES PRESENT
Clr Victor Macri |
Councillor – Midjuburi-Marrickville Ward (Chair) |
Bill Holliday |
Representative for Jamie Parker MP, Member for Balmain |
Maryanne Duggan |
Representative for Jodi McKay MP, Member for Strathfield |
Cathy Peters |
Representative for Jenny Leong MP, Member for Newtown |
SC Tony Kenny |
NSW Police – Inner West Police Area Command |
SC Stephen Flanagan |
NSW Police – Leichhardt Police Area Command |
Tanmila Samin Islam |
Transport for NSW (TfNSW) |
|
|
NON VOTING MEMBERS IN ATTENDANCE |
|
|
|
Clr Marghanita da Cruz |
Councillor – Gulgadya-Leichhardt Ward (Alternate Chair) |
Bob Moore |
Inner West Bicycle Coalition |
Adrian Prichard |
Transit Systems – Inner West Bus Services |
Manod Wickramasinghe |
IWC’s Traffic and Transport Planning Manager |
Christina Ip |
IWC’s Business Administration Officer |
George Tsaprounis |
IWC’s Coordinator Traffic Engineering Services |
Stephen Joannidis |
IWC’s Urban Amenity Improvement Delivery Manager |
|
|
VISITORS |
|
|
|
Nil. |
|
|
|
APOLOGIES: |
|
|
|
Nil. |
|
|
|
DISCLOSURES OF INTERESTS:
Nil.
CONFIRMATION OF MINUTES
The minutes of the Local Traffic Committee meeting held in June 2020 were confirmed.
|
MATTERS ARISING FROM COUNCIL’S RESOLUTION OF MINUTES
The Local Traffic Committee recommendations of its meeting held in June 2020 were adopted at Council’s meeting held on 23 June 2020.
EMAIL CONFIRMATION OF OFFICER’S RECOMMENDATION
The representative for NSW Police – Inner West supported the Officer’s recommendations for the items in their PAC.
LTC0720 Item 1 Terrace Road / Ness Avenue, Dulwich Hill – Temporary Full Road Closure of Rail Underpass just north of the roundabout at Ewart Street – Sydney Metro (SSJ) continuation of early enabling works on T3 Line (Djarrawunang-Ashfield Ward / Summer Hill Electorate / Inner West PAC) |
An application has been received from Sydney Metro (SSJ) for the temporary full road closure of the rail underpass on Terrace Road / Ness Avenue just north of the roundabout at Ewart Street, Dulwich Hill for a two day period being 12.00am Saturday, 8 August 2020 until 12.00am Monday, 10 August 2020 in order to carry out the continuation of early enabling works on the Rail bridge and the standing of an Elevated Work Platform (EWP). The road will be temporarily closed to all vehicular traffic, including emergency vehicles and local residents.
Officer’s Recommendation
THAT the proposed temporary full road closure of the rail underpass on Terrace Road / Ness Avenue just north of the roundabout at Ewart Street, Dulwich Hill for a two day period being 12.00am Saturday, 8 August 2020 until 12.00am Monday, 10 August 2020 be approved in order to carry out the continuation of early enabling works on the Rail Bridge and the standing of an Elevated Work Platform (EWP) subject to, but not limited to, the following conditions:
1. A Road Occupancy License be obtained by the applicant from the Transport Management Centre;
2. All affected residents and businesses, including the NSW Police Area Commander, Fire & Rescue NSW and the NSW Ambulance Services be notified in writing, by the applicant, of the proposed temporary full road closure at least 7 days in advance of the closure with the applicant making reasonable provision for stakeholders; and
3. The occupation of the road carriageway must not occur until the road has been physically closed.
DISCUSSION
Clr da Cruz requested for advance pedestrian detour signs on approach to the closed section of road. Council Officers will forward this request to the applicant for action.
The Committee members agreed with the Officer’s recommendation.
COMMITTEE RECOMMENDATION
THAT the proposed temporary full road closure of the rail underpass on Terrace Road / Ness Avenue just north of the roundabout at Ewart Street, Dulwich Hill for a two day period being 12.00am Saturday, 8 August 2020 until 12.00am Monday, 10 August 2020 be approved in order to carry out the continuation of early enabling works on the Rail Bridge and the standing of an Elevated Work Platform (EWP) subject to, but not limited to, the following conditions:
1. A Road Occupancy License be obtained by the applicant from the Transport Management Centre;
2. All affected residents and businesses, including the NSW Police Area Commander, Fire & Rescue NSW and the NSW Ambulance Services be notified in writing, by the applicant, of the proposed temporary full road closure at least 7 days in advance of the closure with the applicant making reasonable provision for stakeholders; and
3. The occupation of the road carriageway must not occur until the road has been physically closed.
For motion: Unanimous
|
LTC0720 Item 4 Westconnex M5 – St Peters Interchange Active Transport Works – Part 1 (Midjuburi – Marrickville Ward / Heffron Electorate / Inner West PAC) |
The St Peters Interchange project results from a request by the TfNSW and WestConnex for Council to deliver two (2) active transport projects around the M5 WestConnex Interchange at St Peters. The provision of such walking and cycling facilities with 1km of the St Peters Interchange is a condition of consent for the WestConnex M5 project.
The proposal presented reflects the outcomes of a recent concept design stage, including community consultation, and updates the status of the project in which the concept design was presented to the Local Traffic Committee in November 2019. The proposals includes a combination of a two way separated cycleway and shared path on the southern side of Burrows Avenue, adjacent to Sydenham Station and widening the shared path along Mary Street and upgrades to the existing on road cycle route along the other streets including George Street, Henry Street, Grove Street, Bakers Lane.
Following development of the concept designs, two rounds of community engagement, Local Traffic Committee endorsement in November 2019 to progress with the detailed design and implementation and subsequent preparation of detailed design plans. It is recommended that these detailed design plans be approved.
Officer’s Recommendation
THAT:
1. The final design solution for the M5 - St Peters Interchange Active Transport Works (plan no’s. 2997-01 to 2997-07) be approved to enable tender documentation to be prepared and a construction contract advertised; and
2. The TCS designs resulting from this project be forwarded to TfNSW for approval
DISCUSSION
The representative for the Member for Balmain commented that there is a risk of cyclist ‘dooring’ on the shared path near the bidirectional cycle path on the southern side of Burrows Avenue opposite Sydenham Station. Council Officers advised that the bidirectional cycle path terminates east of the car parking bays, and a shared path is proposed adjacent to the car parking. The alignment of the connection is such that it directs cyclists away from the parking to minimise the risk of dooring. Therefore, there is no specific offset distance as cyclists can be positioned anywhere within the shared path. In addition it was noted that there is shared path linemarking indicated on the plans adjacent to the parked cars to guide cyclists away from the car dooring area.
The representative for the Member for Balmain asked for clarity on the cyclist connection near the intersection of Burrows Avenue and Gleeson Avenue. Council Officers advised that the cycle route for this project at the intersection comprises the shared path on the southern side of Burrows Avenue, a shared signalised crossing on Burrows Avenue on the eastern side of the intersection, and a shared signalised crossing on Gleeson Avenue on the northern side of the intersection. The continuation of the cycle route north then links to the proposed shared path on the western side of Gleeson Avenue (on the overbridge) which is to be implemented as part of the Marrickville Road cycleway project.
The TFNSW representative raised a number of issues with the plans as follows:
· The direction at which cyclists are meant to travel in the intersection of Burrows Avenue and George Street is unclear. Council Officers stated that directional signage will be added to the design plan.
· There should be ‘No Parking’ or ‘No Stopping’ at the kerb extension on the northern side of Burrows Avenue. Council Officers stated that ‘No Stopping’ signage can be added if it is a requirement; however, Council has not proposed this at this kerb extension as it is clear that a vehicle cannot park adjacent to the kerb extension and Council has tried to avoid sign clutter.
· The high angle of the pedestrian crossing at the intersection of Princes Highway and Mary Street is unlikely to be supported by TfNSW. Obscure angles can result in reduced sight distance to pedestrians and other concerns. Council Officers stated that the crossing is to be approved via the TCS process; however, the proposed crossing alignment is considered better at providing sight distance than the current alignment.
· There are concerns with the size of the gaps in the island at the intersection of Unwins Bridge Road and George Street. However, this can be dealt with during the TCS reviews.
· Each of the TCS components will need to be reviewed separately and changes to the entire design layout may be required, subject to TCS approval.
· TfNSW plan checking and admin fees will apply.
The Committee members agreed with the Officer’s recommendation.
COMMITTEE RECOMMENDATION
THAT:
1. The final design solution for the M5 - St Peters Interchange Active Transport Works (plan no’s. 2997-01 to 2997-07) be approved to enable tender documentation to be prepared and a construction contract advertised; and
2. The TCS designs resulting from this project be forwarded to TfNSW for approval
For motion: Unanimous
|
General Business
LTC0720 Item 9 Illuminated sign outside Haberfield Rowers Club
The representative for the Member for Balmain asked for a progress update regarding the glare from the Haberfield Rowers Club illuminated sign on the City West Link. Council Officers advised that Council’s Development Compliance Officers have been in discussions with the Club and have had the illumination levels on the LED pylon decreased. The Club has advised that the decrease in brightness has now come into effect.
LTC0720 Item 10 Request for in-road traffic detector in Mary Street, Leichhardt
The representative for the Member for Balmain requested that an in-road traffic detector be installed in the right turn lane in Mary Street at the intersection of Lilyfield Road. This request was sent to TfNSW for comment.
LTC0720 Item 11 Condition of Hawthorne Parade, Haberfield
The representative for the Member for Balmain commented that Hawthorne Parade is in poor condition with numerous potholes and asked whether this was due to heavy vehicles from WestConnex construction. The representative requested that, if the damage was caused by WestConnex, Council endeavour to have WestConnex maintain Hawthorne Parade during their operations and return it to its original condition when they finish. Council Officers will forward this request to Council’s Assets team.
LTC0720 Item 12 Johnson Street, Annandale work site
The Inner West Bicycle Coalition representative requested that the barrier on the Johnson Street bridge work site be moved east about a metre to remove the pinch zone between the refuge and the end of the works, or a ‘No Overtaking’ sign be displayed at the Wigram Road end of the works. This will tie in with the City of Sydney pop-up lane on Pyrmont Bridge Road and improve safety. The representative also requested a temporary pedestrian crossing be installed on Booth Street at Alexandra Drive so pedestrians and cyclists do not need to travel 300 metres to the traffic lights and back to cross the road.
LTC0720 Item 13 Update on Croydon Road and Parrramatta Road intersection improvements
The representative for the Member for Strathfield asked for an update on the improvements proposed for the Croydon Road/Parramatta Road intersection previously raised in the June 2020 meeting. Council Officers stated that TfNSW have indicated that they are finalising the community engagement report to publish by the month end.
This concluded the business of the meeting.